Skip Navigation Links
SEARCH  



 
Bookmark and Share
Rusoro Mining Intersects 37m of 9.34g/t
Metals News - Vancouver, Canada – Rusoro Mining Ltd. is pleased to provide another update on results from ongoing drilling at the Increible 6 Project in Bolivar State, Venezuela. The four main zones (Culebra, Elisa, Olga and Cristina) all continue to be enhanced by the results of the 31 drill holes reported in this news release. The Culebra Zone has been extended 100m by a series of wide, near surface intercepts which average 1.65 g/t over 68.0 metres and intersected above average grade mineralization in a number of holes within the zone including 9.34 g/t over 37.0 metres Ø The Elisa Zone has been extended a further 50m including drill hole IRS-89 which intersected 4.72 g/t over 21.0 metres and an additional 3.47 g/t over 19.0 metres Ø A 50 metre step out hole at the Olga Zone intersected the best intercept to date with a weighted average of 3.31 g/t Au over 17.0 metres. Ø Drilling at the Cristina Zone returned 3.65 g/t Au over 10m and 2.54 g/t Au over 16m.




Disclaimer | Terms Of Use And Privacy Statement


© Metals News. All rights reserved.