Auriant’s operational update reflects the preparations for building the new CIL Plant at Tardan.

  • Gold production reflects planned activity prior to construction of new processes:
    • Total 2017 gold production, including gravitational plant production, was in line with the latest forecast published on October 20, 2017 at 809.4 kg (26,023 oz), which included 761.7 kg (24,487 oz) from Tardan and 47.8 kg (1,536 oz) from Solcocon – This was a decrease of 25% year on year (1,078 kg; (34,669 oz)) reflecting the planned activity pending completion of the CIL Plant.
    • Tardan gravitational plant produced 40.4 kg (1,298 oz) of gold, compared to 144.8 kg (4,657 oz) in 2016. Heap leach production at Tardan decreased by 23% to 721.3 kg (23,189 oz), compared to 933.5 kg (30,012 oz) in 2016.
    • Gold grade in 2017 was in line with the mineplan at 2.36 g/t (2016 - 4.04 g/t).
    • Alluvial production at Solcocon recommenced in 2017 and amounted to 47.8 kg (1,536 oz) of gold. The Company expects alluvial production in 2018 to increase to 150 kg.
  • Exploration continues with good results:
  • The exploration programme at Solcocon continued in 2017; 4,100 meters of core were drilled and 26,000 cubic meters of trenches were made; 4,800 samples were taken. The assessment of the exploration results is currently being undertaken and an announcement will be made in Q1 2018.
  • Construction of new Tardan CIL Plant is on track:
    • As previously announced, mining operations at Tardan will be discontinued in the first 6 months of 2018, and will resume in July 2018. The 2018 production forecast for Tardan is 360 kg.
    • Construction of the CIL plant at Tardan is on track. Key technical equipment has been ordered and down payments made.
    • The construction of the Tardan CIL plant will continue throughout 2018, with the launch targeted for the beginning of 2019.
  • Auriant is preparing for subscription of Warrants to raise US$8.5 million
    • Total issue size – 57 million Warrants to subscribe one share each in the Company. 
    • Subscription price – SEK 2.50-3.50 per share.
    • Exercise of 52% of subscription rights swapped for reduction of shareholder debt.
    • Warrant subscription proceeds will contribute to funding the Tardan CIL Plant and the study at Kara-Beldyr - with the following production milestones - Tardan CIL Plant (first production in H1 2019) and Kara-Beldyr (first production in 2021).
    • The Company will be presenting to investors in Stockholm, London, Moscow and Cape Town during February and March 2018.
    • Since mid-2017, a leading Stockholm investor, Per Ahlgren, has built up an equity holding of some 14.5% in the issued share capital of the Company and is supportive of its prospects.

Production

Production unit 12m 2017 12m 2016  

 Change

 
  kg oz kg oz kg oz %
Hard rock              
Tardan (heap leach)   721.3    23,189    933.5    30,012    (212)    (6,823)  -23%
Tardan (gravitational)   40.4    1,298    144.8    4,657    (104)    (3,359)  -72%
Alluvial              
Solcocon   47.8    1,536    -    -    47.8    1,536   100%
Total gold produced  809.4   26,023   1,078.3   34,669    (268.9)    (8,646)  -25%

Tardan

    12m 2017 12m 2016 Change
Mining          
Waste stripping 000 m3   2,345    3,085    (740)  -24%
Ore mined 000 tonnes   394    418    (24)  -6%
Average grade g/t   2.36    4.04    (1.68)  -42%
Heap leach          
Stacking          
Ore 000 tonnes   369    322    47  15%
Grade g/t   2.02    3.22    (1.20)  -37%
Tailings 000 tonnes   85    63    22  34%
Grade g/t   3.34    4.83    (1.49)  -31%
Gold in ore and tailings stacked kg   1,027    1,342    (315)  -23%
Gold produced kg   721.3    933.5    (212)  -23%
Gravitation          
Throughput 000 tonnes   41    77    (36)  -47%
Average grade g/t   4.81    7.48    (2.67)  -36%
Recovery % 21% 25% -4% -17%
Gold produced kg   40.4    144.8    (104)  -72%
Warehouse on December 31          
Ore 000 tonnes   -    23    (23)  -100%
Grade g/t   -    3.28    (3.28)  -100%
Tailings 000 tonnes   -    31    (31)  -100%
Grade g/t   -    4.91    (4.91)  -100%

For more information, please contact:

Sergey Ustimenko, CEO
tel: +7 495 109 02 82
e-mail: sergey.ustimenko@auriant.com

Company name: Auriant Mining AB
Short name: AUR
ISIN-code: SE0001337213

Website: www.auriant.com
Twitter: @auriantmining

Auriant Mining AB (AUR) is a Swedish junior mining company focused on gold exploration and production in Russia, primarily in Zabaikalye and the Republics of Khakassia and Tyva. The company has currently four assets, including one operating mine (Tardan), one early stage exploration asset and two development assets.

Since July 19, 2010, Auriant Mining´s shares are traded on First North Premier at the NASDAQ OMX Nordic Exchange under the short name AUR. For more information please visit www.auriant.com. Mangold Fondkommission is Certified Adviser to Auriant, for more information please call +46 8 503 015 50 or visit www.mangold.se.

This information is information that Auriant Mining AB is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact persons set out above, at 10:00 CET on January 23rd , 2018.

Cautionary Statement: Statements and assumptions made in this report with respect to Auriant Mining AB’s (“AUR”) current plans, estimates, strategies and beliefs, and other statements that are not historical facts, are forward-looking statements about the future performance of AUR. Forward-looking statements include, but are not limited to, those using words such as "may", "might", "seeks", "expects", "anticipates", "estimates", "believes", "projects", "plans", strategy", "forecast" and similar expressions. These statements reflect management's expectations and assumptions in light of currently available information. They are subject to a number of risks and uncertainties, including, but not limited to, (i) changes in the economic, regulatory and political environments in the countries where AUR operates; (ii) changes relating to the geological information available in respect of the various projects undertaken; (iii) AUR’s continued ability to secure enough financing to carry on its operations as a going concern; (iv) the success of its potential joint ventures and alliances, if any; (v) exchange rates, particularly between the Russian rouble and the U.S. dollar. In the light of the many risks and uncertainties surrounding any gold production and exploration company at an early stage of its development, the actual results could differ materially from those presented and forecast in this report. AUR assumes no unconditional obligation to immediately update any such statements and/or forecasts

This press release shall not, directly or indirectly, be released, published or distributed in or to the United States, Australia Japan, Canada, New Zealand, Hong Kong, South Africa or other country where such action as a  whole or in part is subject to legal restrictions. Nothing in this press release should be considered as an offer to invest or otherwise trade in shares of Auriant Mining AB (publ). The proposed issue will not be directed at residents or those living in the United States, Australia, Japan, Canada, New Zealand, Hong Kong, South Africa or other country where such action would require further prospectus, other offering documentation, registration or other measures beyond those required by Swedish law. No securities will be registered under the United States Securities Act of 1933, a similar law in any state in the United States, or under any provincial law in Canada, nor under the applicable law of another country.

http://prlibrary-eu.nasdaq.com/Resource/Download/53e39476-1be3-48f3-bfdc-caf99148566f





Disclaimer | Terms Of Use And Privacy Statement


© Metals News. All rights reserved.