Skip Navigation Links
SEARCH  



 
Bookmark and Share
Cobalt Blue Holdings Limited (ASX:COB) Quarterly Activities and Cash Flow Reports September 2017
Cobalt Blue Holdings Limited (ASX:COB) provides the Company's Quarterly Activities and Cash Flow Reports for the period ending September 2017.

September 2017 - Highlights

Projects

Thackaringa Project

- Commenced Pre-Feasibility Study (PFS).

- Aerial geophysical survey launched and subsequently completed over the entirety of the Thackaringa tenements (EL6622, EL8143, ML86 & ML87).

- Thackaringa Drilling Campaign - 40Mt Indicated Resource Target - rigs mobilised to site.

- PFS Metallurgical Testwork has now commenced. The testwork will be centred on treating ~800 kg of ore through the proposed process: concentration; thermal treatment; leaching; and product recovery.

Cobalt Trends

- Thrifting - Battery makers are "thrifting" (lowering) cobalt content in the cathode. This is a natural consequence in the face of stronger for longer cobalt pricing.

- Energy Density - Higher (cobalt based) energy density batteries are entering the market increasing Electric Vehicle (EV) range and usability.

- Fast Charge/Discharge - Battery makers are developing semi-solid and solid electrolytes supporting faster charge/discharge cycles - the goal is to fully charge an EV in 5 minutes.

- COB's strategy is to produce a battery grade product required, not today, but rather where demand will be in the future, as these market and enabling technology trends rollout.

Corporate

- Amended JV Agreement announced. Stage One is due for completion by 1 April 2018 followed shortly after by Pre-Feasibility Study delivery (30 June 2018).

To view the full report, please visit:
http://abnnewswire.net/lnk/P739YD4E

Joe Kaderavek
Chief Executive Officer
Cobalt Blue Holdings Limited
Ph: +61-2-9966-5629
Website: www.cobaltblueholdings.com
Email: info@cobaltblueholdings.com





Disclaimer | Terms Of Use And Privacy Statement


© Metals News. All rights reserved.